Tender For supply of 300 nb tail pipe ( reducer type) of collector tank, reducer from 300 nb to 150 nb, length: - 4630 mm , only conical set portion of collector tank with 5 mm ss liner for fae tower to be supplied. , water trap silencer for vaccum pump, pipe od- 450 mm, thick -8. 5 to 9. 2 mm length 1500 mm approx. , complete set of flushing apparatus below economiser hopper.
Tender For supply of boq plungers - plunger with hard chrome plating no 6.000 72791.00 size- dia. 47 +0.0/-0.01 mm x 300.5 mm hard chrome plating length x 400 mm overall length , hard chrome plating thickness- 0.30 mm (maximum) , hardness of hard chrome plating after grinding- 65-70 hrc , surface finish after hard chrome plating- 0.8 microns , material of construction- astm a276 gr. 420 (forged & normalised) , as per drawing no.- nfv/ex/u/m-122 rev. 3 , for h. p. washing pump 31-p-11a/b , plunger with hard chrome plating no 4.000 8564.00 size- dia. 20 +0.0/-0.01 mm x 297.2 mm hard chrome plating length x 310 mm overall length , hard chrome plating thickness- 0.30 mm (maximum) , hardness of hard chrome plating after grinding- 65-70 hrc , surface finish after hard chrome plating- 0.8 microns , material of construction- aisi 316 , as per drawing no.- nfv/ex/u/m-120 rev. 3 , for stripper d.p cell flushing pump 31/41-p-17a/b total - 81354.10 , plunger with hard chrome no 9.000 12000.00 108000.00 plating size- dia. 55 +0.01/-0.00 mm x 405 mm hard chrome plating length x 580 mm overall length , hard chrome plating thickness- 0.30 mm (maximum) , hardness of hard chrome plating after grinding- 65-70 hrc , surface finish after hard chrome plating- 0.8 microns , material of construction- aisi 410 , as per drawing no.- nfv/u/m-132 , for h. p. washing pump 11-p-11a/b. , plunger with hard chrome no 6.000 2500.00 15000.00 plating size- dia. 20 +0.0/-0.02 mm x 190 mm hard chrome plating length x 260 mm overall length , hard chrome plating thickness- 0.30 mm (maximum) , hardness of hard chrome plating after grinding- 65-70 hrc , surface finish after hard chrome plating- 0.8 microns , material of construction- aisi 410 , as per drawing no.- nfv/u/m-125 , for stripper d.p cell flushing pump 11/21-p-17a/b. , plungers for ammonia feed pump with following specification- material - astm a 276 grade 420 ( chrome plated ) , dimension and notes as per drawing nfv/u/m-155 , hardness of chrome plated surface- 550-600 bhn , dp check as per se-165. inspection and testing under third party as per technical note. , plungers for ammonia feed pump with following specification- size- dia. 65 +0.0/-0.01 mm x 375 mm hard chrome plating length x 550 mm overall length , hard chrome plating thickness- 0.30 mm (maximum) , hardness of hard chrome plating after grinding- 65-70 hrc , surface finish after hard chrome plating- 0.8 microns , material of construction- astm a276 gr. 420 (forged & normalised) as per drawing nfv/u-ii/m-210 rev 01 , hardness of chrome plated surface- 65-70 hrc , dpt check as per se-165 , under inspection by lris/bv with scope as as per technical note. , plunger with hard chrome plating , size- dia. 60 mm x 178.5 mm hard chrome plating length x 300 mm overall length , hard chrome plating thickness- 0.30 mm (maximum) , hardness of hard chrome plating after grinding- 55-60 hrc , surface finish after hard chrome plating-0.8 microns , material of construction- astm a276 gr. 420(forged & normalized) , as per drawing no.- nfv/ex/a-ii/m-103 rev.0 , for l. p. ammonical water pump p-3522a/b.
Tender For construction of additional qtrs for staff/officers of reserve bank of india at char imli, bhopal, mp in epc mode-iii. sh:- construction of 72 nos. grade a qtrs (splus9), 10 nos. grade d&e&1 no. grade f qtrs. (splus7). 1 no. rd bunglow(gplus1), 28 nos. class-iii qtrs(splus7) facility block (gplus4), swimming pool, 33kv electrical sub station & building, 2 nos. gate & security blocks i/c internal & external w/s, s/i, e/i and development works & bulk services of roads, footpath, drains, retaining walls, ug sump & pump room, sewage treatment plant, upgradation of main campus boundary wall, cctv system, networking, dg set, fire fighting system, fire alarm system, street lighting, lifts, ev charging, owc, domestic & flushing water pumping system, solar pv system, boom barrier, gas suppression system, signages, ups, mechanical ventilation and pressurization system, bms, horticulture work, site office, barricading construction site i/c demolishing of existing residential d block and temporary structure. (package-1)
Tender For maintenance contract of turbine and auxiliaries in a thermal power plant of 2x500 mw dtps anpara b b - overhauling of tdbfp aop onejob consists of one pump , major inspection or overhauling of tdbfp eop onejob consists of one pump , cleaning inspection and rectification of tube leakages if any of lube oil coolers of mdbfp onejob consists of one cooler , cleaning inspection and rectification of tube leakages if any of working oil coolers of mdbfp one job consists of one cooler , inspection oroverhauling of cot or dot room transferoil pumps one job consists of one pump , overhauling of transfer oil pumps or gear oil pumpsand other similar pumps one job consists of one pump , replacement of coupling of transfer oil pumps or gear oil pumps or tdbfp jops and other similar pumps one job consists of one pump , axial and radial alignment of transfer oil pump or recirculation pump or tdbfp jop cot or dot room transfer oil l pump and other similar pumps one jobconsists of one pump , overhauling of vapour extractor of mot or control fluid tank or tdbfp oil tank and seal steam system one job consists one vapour extractor , cleaning of centrifuge bowl of tdbfp one job consists of one centrifuge bowl , overhauling of recirculation pump of vacuum pump , cleaning of tdbfp oil tank one job consists ofone oil tank , cleaning of main oil tank of turbine or cot or dot one job consists of one tank , alignment and adjustment of recirculation pump withmotor , cleaning of centrifuge bowl of main turbine and cot or dot one job consists of one centrifuge bowl , replacement of the burst atmospheric relief diaphragm of lp turbine , inspection or cleaning flushing and normalization of condenser hot well , inspection or cleaning flushing and normalization of deaerator , inspection or cleaning flushing and normalization of feed water storage tank , inspection or cleaning flushing and normalization of tg or sg ecw tank one job consists of one tank , replacement of turbine hp orlp bypass oil and minor revisioning of hp bypass oil system , centrifuging of lube oil through portable centrifuging machine , inspection or cleaning of sg plate heat exchanger , inspection or cleaning of tg plate heat exchanger , inspection cleaning and revisioning of acw pump suction strainer one job consists of 01 strainer , filling flushing and normalization of tg or sg ecw system one job per cooling system , cleaning and revisioning of tdbfp aop suctionfilter one job per filter , cleaning and revisioning of duplex lube oil filterof tdbfp one job per filter , cleaning and revisioning of eop filter of tdbfp , cleaning and revisioning of lube oil filter of mdbfp one job per filter , cleaning of duplex lube oil filter of main turbine one job per filter , cleaning of jop duplex filter of main turbine one job per filter , cleaning of bucket filter of main oil tank or control fluid tank one job per filter , cleaning of self cleaning filter of protection rack of main turbine 1 job consists of two filters , inspection or replacement of dry filter or mechanical filter super fine filter one job per set , inspection or replacement of fuller earth filter one job per set , cleaning of duplex filter mounted on valve rack of governing system of main turbine one job per filter , cleaning of cep suction strainer or bfp booster pump suction strainer one job per strainer , cleaning of bfp conical strainer one job per strainer , revisioning or replacement or cleaning of pilot valve of main turbine one job consists one pilot , revisioning or replacement or cleaning of pilot valve of m c v or aux c v of tdbfp one job consists one pilot , servicing of isolating valve control valve and nrvsof condensate line tdbfp extraction extraction 5 and booster pump suction line //bid details3 / 108size400 mm class150 to 300 , servicing of isolating valve control valve and nrvs installed on bfp discharge feed discharge line hph inlet or outlet hph 50 percentage bypass and other similar valve , servicing of hph 100 pe